International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : CACE : Circulars  Recently posted -  Search Meeting Documents
   
ITU-R CACE  CIR 

ITU-R CACE

Radiocommunication Assembly and Study Group work

Results:1038 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21  - Next Next
Circulars
 
Number 
Title Source AI/Question
Date
[ 957 ]  
 
Meeting of Radiocommunication Study Group 4 (Satellite Services) - e-Meeting, 6 November 2020     Director, BR     2020-09-30
[ 956 ]  
 
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - e-Meeting, 16 October 2020     Director, BR     2020-09-11
[ 955 ]  
 
Technical characteristics, operational parameters, and protection criteria for sharing and compatibility studies required for WRC-23     Director, BR     2020-09-08
[ 954 ]  
 
Meeting of Radiocommunication Study Group 5 (Terrestrial Services) - e-Meeting, 23 November 2020     Director, BR     2020-09-04
[ 953 ]  
 
Proposed adoption of 1 draft revised ITU-R Recommendation and its simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 5     2020-08-04
[ 952 ]  
+Corr.1 
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - Geneva, 3 December 2020     Director, BR     2020-07-21
[ 951 ]  
 
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - Geneva, 21 August 2020     Director, BR     2020-07-10
[ 950 ]  
+Corr.1 
Meeting of Radiocommunication Study Group 4 (Satellite Services) - Geneva, 6 November 2020     Director, BR     2020-06-22
[ 949 ]  
+Corr.1 
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 16 October 2020     Director, BR     2020-06-01
[ 948 ]  
 
Adoption of 1 revised ITU-R Recommendation and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Suppression of 9 ITU-R Recommendations     SG 6     2020-04-27
[ 947 ]  
 
Suppression of 5 ITU-R Questions     SG 6     2020-04-21
[ 946 ]  
+Corr.1-2 
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - Geneva, 19 June 2020, postponed to 21 August 2020     Director, BR     2020-03-02
[ 945 ]  
 
Proposed adoption of 1 draft revised ITU-R Recommendation simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (PSAA). Proposed suppression of 9 ITU-R Recommendations     SG 6     2020-02-17
[ 944 ]  
 
Proposed suppression of 5 ITU-R Questions     SG 6     2020-02-17
[ 943 ]  
+Corr.1 
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - Geneva, 8 June 2020, postponed to 3 December 2020     Director, BR     2020-01-29
[ 942 ]  
+Corr.1-3 
Meeting of Radiocommunication Study Group 5 (Terrestrial Services) - Geneva, 8 May 2020, postponed to 31 July 2020     Director, BR     2020-01-29
[ 941 ]  
+Corr.1 
Meeting of Radiocommunication Study Group 7 (Science Services) - Geneva, 20 April 2020     Director, BR     2020-01-14
[ 940 ]  
 
Approval of 1 revised ITU-R Recommendation     SG 6     2019-12-16
[ 939 ]  
 
Adoption of 3 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 5     2019-11-19
[ 938 ]  
 
Approval of 6 revised ITU-R Recommendations     SG 5     2019-11-19
[ 937 ]  
 
Approval of 2 new ITU-R Questions and 10 revised ITU-R Questions - Suppression of 1 ITU-R Question     SG 5     2019-11-19
[ 936 ]  
 
Approval of 1 draft new ITU-R Question and 8 revised ITU-R Questions - Suppression of 7 ITU-R Questions     SG 6     2019-10-23
[ 935 ]  
 
Approval of 1 revised ITU-R Recommendation     SG 3     2019-10-21
[ 934 ]  
 
Approval of 3 revised ITU-R Recommendations     SG 1     2019-10-21
[ 933 ]  
 
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 14 February 2020     Director, BR     2019-10-16
[ 932 ]  
 
Adoption of 2 new ITU-R Recommendations and 9 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence) - Suppression of 1 ITU-R Recommendation     SG 6     2019-10-14
[ 931 ]  
 
Proposed approval of 1 draft revised ITU-R Recommendation     SG 6     2019-10-09
[ 930 ]  
 
Approval of 5 revised ITU-R Recommendations     SG 4     2019-09-18
[ 929 ]  
 
Adoption of 1 new ITU-R Recommendation and 1 revised ITU-R Recommendation and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 4     2019-09-18
[ 928 ]  
 
Adoption of 1 new ITU-R Recommendation and its simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     CCV     2019-09-18
[ 927 ]  
 
Proposed approval of 2 draft new ITU-R Questions and 10 draft revised ITU-R Questions. Proposed suppression of 1 ITU-R Question     SG 5     2019-09-05
[ 926 ]  
 
Proposed approval of 6 draft revised ITU-R Recommendations     SG 5     2019-09-05
[ 925 ]  
 
Proposed adoption of 3 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 5     2019-09-05
[ 924 ]  
 
Adoption of 22 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 3     2019-08-26
[ 923 ]  
 
Approval of 1 new ITU-R Question     SG 1     2019-08-21
[ 922 ]  
 
Adoption of 1 new ITU-R Recommendation and 3 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 1     2019-08-21
[ 921 ]  
 
Approval of 1 new ITU-R Question and 6 revised ITU-R Questions     SG 3     2019-08-19
[ 920 ]  
 
Approval of 5 revised ITU-R Recommendations     SG 3     2019-08-14
[ 919 ]  
 
Adoption of 4 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence) and suppression of 2 ITU-R Recommendations     SG 7     2019-08-14
[ 918 ]  
 
Suppression of 1 ITU-R Question     SG 7     2019-08-13
[ 917 ]  
 
Proposed approval of 3 draft revised ITU-R Recommendation     SG 1     2019-08-13
[ 916 ]  
 
Proposed approval of 1 draft revised ITU-R Recommendation     SG 3     2019-08-13
[ 915 ]  
 
Proposed adoption of 1 draft revised ITU-R Recommendation     SG 6     2019-07-30
[ 914 ]  
 
Proposed approval of 1 draft new ITU-R Question and 8 draft revised ITU-R Questions - Proposed suppression of 7 ITU-R Questions     SG 6     2019-07-30
[ 913 ]  
 
Proposed adoption of 2 draft new ITU-R Recommendations and 9 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence) - Proposed suppression of 1 ITU-R Recommendation     SG 6     2019-07-29
[ 912 ]  
 
Proposed adoption of 1 draft new ITU-R Recommendation and its simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     CCV     2019-07-11
[ 911 ]  
 
Proposed adoption of 1 draft new ITU-R Recommendation and 1 draft revised ITU-R Recommendation and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 4     2019-07-10
[ 910 ]  
 
Proposed approval of 5 draft revised ITU-R Recommendations     SG 4     2019-07-10
[ 909 ]  
 
Adoption of 2 new ITU-R Recommendations and 4 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2019-06-24
[ 908 ]  
 
Approval of 1 new ITU-R Question and 4 revised ITU-R Questions - Suppression of 2 ITU-R Questions     SG 6     2019-06-18
Results:1038 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-05-16